| False Start at the Beginning 
  Our plan was to wait until the middle of the winter, when the ground was 
  frozen solid, to move the large boulders to build the retaining walls for the 
  fountain. They were located in various places throughout the property and we 
  wanted to make sure the ground was hard so it would not get damaged by the 
  excavator.
 
  
  There was a false start when the excavator operator started work when we had 
  to go out of town. There was quite a bit of work that had to be re-done and 
  potential damage to the property caused by this. 
  
  The excavator tracked across the "New Green" carrying boulders. Unbelievably 
  it did not dent the green or harm the turf. We suffered a minor setback in 
  plan when the incorrect design was fabricated part way to completion. This was 
  later torn down and the boulders set out on the ground for future 
  installation.
 
 | |
 